While going to develop brick masonry, the points given below should be taken into consideration :-
1. It is recommended to use standard quality bricks which contain consistent color. Besides, bricks should be burnt perfectly and contain perfect shape and size.
2. Prior to utilize the bricks in masonry, they should have been drenched in water for 2 hours to avoid water consumption from the mortar.
3. Bricks should be placed with the frog pointing upward.
4. The brick wall should be built up from the end or corner.
5. Brick courses should have been correctly horizontal.
6. A plumb-bob is used to verify the verticality of the wall on a regular basis.
7. Mortar should be applied on the basis of the specification.
8. Whenever work is finished brick masonry should be discarded with toothed end.
9. Refrain from utilizing brick bats.
10. Walls should have been lifted up homogeneously. The variation among adjoining walls should not be over 1 m. In a day no wall should be lifted up by above 1.5 m.
11. To provide perfect key for plastering or pointing, the face joints should be lifted up to a depth of 12 to 20 mm, as soon as the mortar is green. If there is no plastering or pointing, face joints should be fixed flush and finished precisely.
12. Holdfasts for doors and windows should be set in brick masonry along with cement mortar or concrete while building up the wall independently.
13. Brick masonry should be cured frequently for 2 weeks.
14. Single scaffolding should have been utilized for the formation of brick work at higher levels.
Source : http://www.civilengineeringx.com
1. It is recommended to use standard quality bricks which contain consistent color. Besides, bricks should be burnt perfectly and contain perfect shape and size.
2. Prior to utilize the bricks in masonry, they should have been drenched in water for 2 hours to avoid water consumption from the mortar.
3. Bricks should be placed with the frog pointing upward.
4. The brick wall should be built up from the end or corner.
5. Brick courses should have been correctly horizontal.
6. A plumb-bob is used to verify the verticality of the wall on a regular basis.
7. Mortar should be applied on the basis of the specification.
8. Whenever work is finished brick masonry should be discarded with toothed end.
9. Refrain from utilizing brick bats.
Image Source : http://www.akbworks.com |
10. Walls should have been lifted up homogeneously. The variation among adjoining walls should not be over 1 m. In a day no wall should be lifted up by above 1.5 m.
11. To provide perfect key for plastering or pointing, the face joints should be lifted up to a depth of 12 to 20 mm, as soon as the mortar is green. If there is no plastering or pointing, face joints should be fixed flush and finished precisely.
12. Holdfasts for doors and windows should be set in brick masonry along with cement mortar or concrete while building up the wall independently.
13. Brick masonry should be cured frequently for 2 weeks.
14. Single scaffolding should have been utilized for the formation of brick work at higher levels.